Close

Acquisition of land measuring 1.317 acres at mouja Singerbil Sheet No. 1(3)/P for construction of Multi Level Car Parking in front of New Integrated Terminal building at MBB Airport under West Tripura District.

Acquisition of land measuring 1.317 acres at mouja Singerbil Sheet No. 1(3)/P for construction of Multi Level Car Parking in front of New Integrated Terminal building at MBB Airport under West Tripura District.
Title Date View / Download
Acquisition of land measuring 1.317 acres at mouja Singerbil Sheet No. 1(3)/P for construction of Multi Level Car Parking in front of New Integrated Terminal building at MBB Airport under West Tripura District. 29/07/2022 View (632 KB)